Long Days, Short Nights
Posted in Port 412, Training, Tulips on July 22nd, 2009 by ColinBrandon is going to a wedding this weekend, and he wants to get most of the tiling done at Tulips before he goes, so I’m covering for him at the front of the house…A LOT. I’m praying Amy, the other FOTH manager, is scheduled a lot as well so I can get back into the kitchen or just have a break.
I attended an 8-hour food safety class with Tom, Brandon, Jeff, and Tim, and we took a test to get our ServSafe certification. (We’ll find out in 2 weeks, but we’re all pretty confident about it since the instructor was great, the fairly easy test, and the pass bar set fairly low.)
Yesterday I didn’t need to be in until 4p, but I volunteered to come in at 9a so Brandon could get started early on the tiling. I was there until 10p.
Today, same thing, 9a-10p.
Tomorrow, 10a-close (11p).
Friday, noon-close (11:30p).
Saturday, 3p-close (11:30p).
Sunday, 3p-close (11p).
Then on Monday I have a Tulips tasting at 3p.
And then I would like to pass out until the afternoon of the next day.